PRODUCT
Product Description
I. Core Structure (Three-Layer Composite)
- Top Layer (Protective Layer): HDPE/PP/PET geotextile, wear-resistant, UV-resistant, and breathable.
- Middle Layer (Core Layer): Special dry cement + quartz sand + curing agent, reaches 70% strength after 24 hours of contact with water, and fully cures in 28 days.
- Bottom Layer (Waterproof Lining): PVC/HDPE geomembrane, highly impermeable, leak-proof, and water-retaining.
II. Specifications (Mainstream)
- Thickness: 6mm/8mm/10mm/12mm (commonly 8-10mm).
- Weight: 12-18kg/㎡ (mainstream 15kg/㎡).
- Width: 1m/1.5m/2m (maximum 50m/roll).
- Strength: Compressive strength ≥20MPa, flexural strength ≥3MPa, tensile strength ≥800N/100mm.
- Colors: Gray (regular), Green (landscape), Black (anti-aging).
III. Core Advantages (Compared to Traditional Concrete)
1. Extremely Simple Construction: No formwork or mixing required. The process is simple: unroll → spread → water → cure. Three people can lay 2000㎡ per hour, reducing construction time by 60%.
2. Extremely Material-Saving: Uses 90%-95% less material than traditional concrete, significantly reducing costs.
3. Flexible Adhesion: Can be freely cut and bent, adaptable to slopes, curves, and irregular structures, perfectly fitting complex terrains.
4. High Strength and Durability: Fiber-reinforced for crack resistance, impact resistance, acid and alkali resistance, freeze-thaw resistance, and aging resistance. Durable for 10-20 years outdoors.
5. Waterproof and Seepage-proof: Dense and seepage-proof after curing, with a seepage resistance ≥0.4MPa, suitable for canals, reservoirs, etc.
6. Environmentally Friendly and Safe: Dust-free, construction waste-free, low alkali content, eco-friendly.
7. All-Weather Construction: Can be constructed from -5℃ to 40℃, and can be quickly resumed after rain.
IV. Applicable Scenarios
- Water Conservancy Projects: Riverbank Protection, Canal Lining, Reservoir/Fishpond/Water Storage Tank Seepage Prevention, Dam Reinforcement.
- Municipal Infrastructure: Foundation Pit Support, Drainage Ditches, Slope Protection, Road Repair, Pipe Gallery Foundations.
- Agricultural Facilities: Irrigation Canal Renovation, Aquaculture Pond Seepage Prevention, Terraced Field Soil Stabilization, Greenhouse Drainage Ditches.
- Mining Environmental Protection: Tailings Dam Seepage Prevention, Slope Stabilization, Rainwater Diversion Channels, Slag Yard Covering.
- Emergency Rescue: Rapid Road/Dam Repair, Landslide Control, Temporary Protection, Post-Disaster Reconstruction.
- Landscape Architecture: Park Trails, Courtyard Hardening, Tree Pit Covering, Artificial Rockery Shaping.
V. Construction Key Points (Four-Step Quick Completion)
1. Site Preparation: Clean, level, and compact the foundation, ensuring there are no sharp objects.
2. Fabric Laying: Unroll and lay flat, overlapping by at least 10cm, and secure with U-shaped ground stakes (1-1.5m spacing).
3. Watering: Water evenly (≥2kg/㎡), ensuring thorough saturation. Shape can be adjusted within 2 hours.
4. Curing: Avoid walking on the surface for 24 hours, maintain moisture for 7 days, and achieve optimal strength in 28 days.
VI. Selection Recommendations
- Consider thickness: 8-10mm for slope protection/ditching, 12mm+ for heavy-duty/seepage prevention.
- Consider material: Choose virgin PE/PP fiber + high-grade aluminate cement for stronger aging resistance.
- Consider weight: Prioritize 15kg/㎡; too thin and it's easily broken, too thick and it's wasteful.
- Consider workmanship: Densified weave, undamaged waterproof backing, smooth fabric surface, and good toughness.
Product Show

Project Case Studies
Hydraulic Engineering
Riverbank Slope Protection Project
Riverbank Slope Protection Project
Hydraulic Engineering
Artificial Lake Anti-Seepage Project
Artificial Lake Anti-Seepage Project
Salt Field Drying
Project Case Studies
Project Case Studies
Landfilling
Landfill Liner Systems
Landfill Liner Systems
Waste Landfilling
Solid Waste Landfill Project
Solid Waste Landfill Project
Launch Your High-Efficiency Anti-Seepage Solution
Our team of experts will provide you with a customized quotation and technical recommendations within 24 hours.
Related Products
Leave A Message
If you are interested in our products and want to know more details, please leave a message here, we will reply you as soon as we can.